|
2017 |
Contruction of Steel Shed & Parking Area at Assab Base |
GHQ Armed Forces Command of Military Works, AUH |
Contruction of Steel Shed & Parking Area at Assab Base (Ref. No. DMC/2017/Q/45) |
1 |
2017 |
Construction of Brak Water Maina & Dredging works at Assab Eritrea (CMW-2017-N07) |
UAE Armed Forces Command Of Military Works |
Construction of Brak Water Maina & Dredging works at Assab Eritrea |
2 |
2016 |
Plant & Equipment Maintenance |
Federal Electricity & Water Authority |
Plant & Equipment Maintenance |
3 |
2016 |
Port Construciton-Construction of Naval Jetty at Barbara(CMW-2016-N014) |
UAE Armed Forces Command Of Military Works |
Port Construciton-Construction of Naval Jetty at Barbara(CMW-2016-N014) |
4 |
2016 |
Floating Marine Fence Maint. |
JBI Properties Services |
Floating Marine Fence Maint. |
5 |
2016 |
Equipment Hire |
National Marine Dredging Company |
Hire Electric Hydraulic power pack with 30 mtrs long hydraulic hose of 3 lines |
6 |
2016 |
Barge RAPID 3313 Salvage |
Topniche Mairne Group |
Barge RAPID 3313 Salvage |
7 |
2016 |
Mirfa Independent water & Power Plant Project-Zinc Anodes Installation |
Samyoung Co. Ltd. |
Zinc Anodes Installation |
8 |
2016 |
Auto Vent Cylinder Repalcement |
Enigneers Office |
Supply and install 315mm gate valve including all accessories required. Supply, Fabrication and Installation of Surge vessel bladder type similar to the existimg one including all required fittings and accessories. Supply and install air vent valve to the top of the Surge vessel. |
9 |
2016 |
Consultancy Agreement-Prelay Geophusical Survey for isntallation of Submarine Cable to Al Qaffay Island Abu Dhbai, UAE |
Al Nasar Contracting Company LLC |
Prelay Geophusical Survey for isntallation of Submarine Cable to Al Qaffay Island Abu Dhbai, UAE |
10 |
2016 |
Water supply to Two Islands at Al Hanjura Area (Contract No. D-105013) |
ADCC - General Construction Company W.L.L. |
Water supply to Two Islands at Al Hanjura Area (Contract No. D-105013) |
11 |
2016 |
Demobilization Work at Mirfa Independent water * Power Plant Project |
HYUNDAI - Gusan Contruction Co. L.t.d. |
Cutting & Removal of Existing Sheet piles & Dreding |
12 |
2015 |
Jetty at the Beach House in Shamal |
Consulidated Gulf Company W.L.L. |
Supply and Installation of Gabion Breakwater at the Beach House in Shamal - Qatar |
13 |
2015 |
The Pearl Qatar Beach Improvement Works |
Al Huda Engineering Works |
The Pearl Qatar Beach Improvement Works |
14 |
2015 |
Construction Package 12-D (CP 12-D) Bund Removal and Flooding of Lagoons at Lusail City |
Al Huda Engineering Works |
Construction Package 12-D Bund Removal and Flooding of Lagoons at Lusail City |
15 |
2015 |
Construction Package 12-D (CP 12-D) Bund Removal, Flooding of Lagoons and Beach Constructions |
Al Huda Engineering Works |
Construction Package 12-D (CP 12-D) Bund Removal, Flooding of Lagoons and Beach Constructions |
16 |
2015 |
Bossaso Port Extention |
Divers Group |
QUAY WALL CONSTRUCTION AND DREDGING WORKS -BOSSASO PORT, SOMALIA |
17 |
2015 |
Arzannah Island & Silaa - Piling Works |
SEPTECH EMIRATES L.L.C. |
Design, Manufacture, Supply, Installation and commissioning of Concrete ; Pontoons at Arzanah Island and Al Sila Location & Meghraq |
19 |
2014 |
Piling Works at Northern Emirates |
Marinas Performance LLC |
Supply and Installation of Tubular Steel Piles and supporting works for the CICPA Squadron Pontoons Deployment Project (Dibba Al Akkamiya, Al Gheer, Al Rams, Umm Al Quwain, Ras Al Khaimah, Sharjah Port) |
20 |
2014 |
Pilling Works at Jumairah, Um Suqeim 1 and Um Suqiem 2 |
Australian Marine Technology LLC |
Mobilization and Demobilization of all site equipment , Marine Vessels and manpower. Installation of Client Supplied steel tubular piles 508 mm Dia. 12 WT and 14m long |
21 |
2014 |
Suction Pump Screens Cleaning works at ESI Phase-1 Jetty |
Emirates Steel Industries, Abu Dhabi, U.A.E. |
Dismantling, Cleaning, and Reinstalltion of Screen A1 & A2, B1 & B2, C1 & C2, D1 & D2 |
22 |
2014 |
The Pointe-Palm Jumeriah |
Gulf Technical Construction Company |
Design, Supply and Installation of Floating Pontoons, Demarcation and Dredging work. |
23 |
2014 |
Palma Residences |
Dubai Civil Engineering |
Construction of Jetties |
24 |
2014 |
Repairing of sea under water 315mm HDPE pipeline |
Engineer's office |
Remove the damaged HDPE pipe from sea bed and replace new one, adding additional concrete collars and make video & Photographic inspection report. |
25 |
2014 |
CICPA for Design, Manufacture, supply, Installation and Commissioning of the Floating Pontoons at Al Jazeera Al Hamra, Ras Al Khaimah, U.A.E |
SEPTECH EMIRATES L.L.C. |
Design, Manufacture, supply, Installation and Commissioning of the Floating Pontoons at Al Jazeera Al Hamra. |
26 |
2013 |
Construction Of Marine Fence at Ladies Beach, Bateen, Abu Dhabi |
JBI Properties |
The intended purpose of the scope is to develop safe and functional driving of piles for marine fence and installation of complete marine fencing system. |
27 |
2012 |
Construction Of Sheet Pile Jetty and Other Works at Ownedo Port at Gabon |
Gabon Port Authority - Oprag, Gabon |
Construction of Port Jetty for 500LM including Gantry Crane and Jetty Accessories |
28 |
2011 |
Supply & Installation of 3.3 US MGD SWRO Plant and Additional 2nd Pass to Existing 2 US MGD SWRO Plant at Delma Island |
Concorde - Corodex Group, Abu Dhabi, U.A.E. |
Complete mobilization and demobilization, All required offshore excavation works, Installation of Owner Supplied HDPE Pipeline 800mm dia. Installation will be done for Pipeline # 01 from Chainage 0+10 to 0+275 and Pipeline # 02 from Chainage 0+10 to 0+270 and complete backfilling, Complete Flang connection works for Both Pipeline and welding if required, Allow for Owner Supplied Screen, Elbow and Flanges Installation. (02 Sets.) |
29 |
2011 |
Repairing of 160mm Dia Damaged HDPE Pipeline at Between area In Two Different Places |
Abu Dhabi International Marine Sport Club, Abu Dhabi, U.A.E. |
Repair of 160mm Dia Damaged HDPE Pipeline at Between area including Mobilization and Demobilization, supply of Marine Vessels, HDPE pipe welding machine size 160mm, Generator, Divers including Pipe Cutting and repairing tools with Diving Accessories, etc… |
30 |
2011 |
Shifting of Floating Marina at Khalidiya Jetty |
Capriole General Construction Company, Abu Dhabi, U.A.E. |
Shifting of Existing floating marina from the current location at Khalidiya Jetty to another location approximately 50 meters away at the same area including all accessories with instruction of Capriole’s Engineer. |
31 |
2011 |
Underwater Survey Report at Phase 1 – Seawater Intake Jetty, Mussafah, Abu Dhabi |
Emirates Steel Industries, Abu Dhabi, U.A.E. |
Carried out 60meter circle Underwater Survey around the pump suction area and provide a report on the seabed condition of the same |
32 |
2011 |
Improvement Job At Phase-1, Seawater Jetty Area |
Emirates Steel Industries, Abu Dhabi, U.A.E. |
Construction of Rock Revetment for 100Lm, Supply and Install of Barrier System for 300Lm, Dredging Works, Pile Cleaning and Underwater Video Inspection Works. |
33 |
2011 |
Vessel Hire - Barge “Al Baraka” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Hire of Barge “Al Baraka” for 25 days with long boom excavator with One Shift Operator, One Supervisor / Foreman, One Diver and Helper. |
34 |
2011 |
Hire of Barge “Diver 5” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Hire of Barge “Diver 5” for 09 days including hydraulic Spud System with Power Pack, Long Boom Excavator with One Shift Operator, One Spud Operator and Helper. |
35 |
2011 |
Hire of Trenching Machine with Operator |
Abu Dhabi Maintenance And Construction Co. L.L.C., Abu Dhabi, U.A.E. |
One Month hire charge for trenching Machine Hire with Operator |
36 |
2011 |
Construction of Canals and Pedestrian Bridge |
Nurol General Contracting Co. L.L.C., Abu Dhabi, U.A.E. |
Installation of 2 Nos 900mm dia. GPR Pipe Lines Connection for PS A3 |
37 |
2011 |
Supply and Install of 3 Nos. of S.S. Screen Container with PVC Screen Filter |
Technical Integrated System & Solutions, Abu Dhabi, U.A.E. |
Supply and Install of 3 Nos. of S.S. Screen Container with PVC Screen Filter including quick release Coupling and Precast Concrete Seal with SS Strap to keep the screen 2.00 below from the LL Water level with using of manpower including Divers, Lowbed and Excavator and required other materials and equipments. |
38 |
2011 |
Erosion Protection |
National Marine Dredging Company, Abu Dhabi, UAE. |
Abu Dhabi Corniche Swimming Beach. Trimming, Rock Sill & Installation of floating Barrier along 3250 Meters Beach Length. |
39 |
2011 |
Construction of Slipway, Helipad and other Works At Armed Forces Observation Site @ Al Baraka (Contract # MW-OU-173-2010) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction of Slipway, Helipad and other Works At Armed Forces Observation Site (2ND Stage) |
40 |
2011 |
Construction of Coast Guard (Contract # MW-CG-279-2008) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction Of Sheet Pile Jetty for 148.15Lm, Tubular Pile Jetty for 82Lm, Construction of 02 Sheds as size of (45*14)m and (45*11)m, Complete backfilling and Compaction Works, Supply and Install of Floating Marina, Capping Beam and Supply and Install of Jetty Accessories. |
41 |
2010 |
Sea Chest Cleaning Camperduin |
National Marine Dredging Company, Abu Dhabi, UAE. |
Sea Chest Cleaning Camperduin |
42 |
2010 |
Vessel “Ocean Line 2” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Hull Inspection Ocean Line 3 |
43 |
2010 |
Vessel “Tug P 11” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Propeller Inspection Tug P 12 |
44 |
2010 |
Sea Bead Survey Embark 2 Dredging Area |
National Marine Dredging Company, Abu Dhabi, UAE. |
Sea Bead Survey Embark 2 Dredging Area |
45 |
2010 |
Underwater Searching New Mussafah Channel |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Searching New Mussafah Channel |
46 |
2010 |
Vessel “Multi Cat M 12” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Photo Survey Multi Cat M 13 |
47 |
2010 |
Vessel “Tarka” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Fixing of Wire Rope Tarka |
48 |
2010 |
Vessel “Multi Cat M 13” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Inspection Multi Cat M 14 |
49 |
2010 |
Underwater Searching Signal Post |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Searching Signal Post |
50 |
2010 |
Vessel “Multi Cat M 12” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Propeller Inspection Multi Cat M 12 |
51 |
2010 |
Vessel “Multi Cat M 11” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Propeller Inspection Multi Cat M 11 |
52 |
2010 |
Dredger “Al Shahamah “ |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Searching Missing Sped Dredger Al Shahamah |
53 |
2010 |
Vessel “Multi Cat M 4” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Propeller Inspection Multi Cat M 5 |
54 |
2010 |
Underwater Searching |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Searching |
55 |
2010 |
Underwater Inspection 96M Floater Line |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Inspection 96M Floater Line |
56 |
2010 |
Sea Bed Survey |
National Marine Dredging Company, Abu Dhabi, UAE. |
Sea Bed Survey |
57 |
2010 |
Dredger “Al Sadar” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Inspection Sinker Line for Dredger Al Sadar |
58 |
2010 |
Re-Float Sinker Line |
National Marine Dredging Company, Abu Dhabi, UAE. |
Re-Float Sinker Line |
59 |
2010 |
Underwater Propeller Inspection Soha Folk |
Soha Folk, Abu Dhabi, UAE. |
Underwater Propeller Inspection Soha Folk |
60 |
2010 |
Magnetic Survey at Old Mussafah Channel |
National Marine Dredging Company, Abu Dhabi, UAE. |
Magnetic Survey at Old Mussafah Channel |
61 |
2010 |
Vessel “Multi Cat M 10” |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Propeller Inspection Multi Cat M 11 |
62 |
2010 |
Tug T 1 |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Propeller Inspection Tug T 1 |
63 |
2010 |
Tug T 1 |
National Marine Dredging Company, Abu Dhabi, UAE. |
Underwater Propeller Inspection Tug T 1 |
64 |
2010 |
Sea Chest Cleaning |
National Marine Dredging Company, Abu Dhabi, UAE. |
Sea Chest Cleaning |
65 |
2009 |
Pilling Works |
Clement Gulf Systems FZCO, Dubai, UAE. |
Supply , Deliver & Drive Tubular Steel Piles including Protective Coating System |
66 |
2009 |
Fabrication of Barges |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Fabrication of 02 Nos Top Flat Barges |
67 |
2009 |
Connection Works For Water Lines From Al Marfa to Jenanah and Murawah Islands for Armed Forces (Contract # MW-OU198-2008) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
HDPE Pipe Line (500 mm Dia, 450 mm Dia., 4" Dia, 3" Dia.) For approximately length of 23,000 meters from Mirfa to Jenanah and Murawah Island including pipe supply, deliver and installation with backfill works. Scope of work is included construction of 02 Water lakes (110*55) meter for capacity of 4.5 million US gallons for each lakes with HDPE liner, Floating Cover, construction of two operating Pump Houses and installation of water tanks |
68 |
2008 |
Construction Of 45 Boats Of Marina @ Al Ghazlan Island, Abu Dhabi, U.A.E. |
Capriole General Construction Company, Abu Dhabi, U.A.E. |
Construction of Floating Marina for 45 Boats |
69 |
2008 |
Beach Works @ H.H. Sheikh Haza'a island, Musafah Palace, Abu Dhabi, U.A.E. |
Capriole General Construction Company, Abu Dhabi, U.A.E. |
Beach Renovation Works |
70 |
2008 |
Construction Of Floating Marina for 129 Boats @ Fishing Port, Abu Dhabi, U.A.E. |
Fishery Co-Operative Of Abu Dhabi, U.A.E. |
Construction Of Floating Marina for 129 Boats |
71 |
2008 |
Expansion Of 400 Kv OHL Grid To Incorporate New S/S
At Taweelah 'B'
Extension Sadiat And Bahia
|
KEC International Limited, Abu Dhabi, U.A.E. |
31 m DAM ROAD & (35 x 35) m TOWER PROTECTION |
72 |
2008 |
Construction of Breakwaters for 260 & 120 LM at Mina Zayed Port (Contract # MW-NF-120-2008) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Breakwater Construction for 260 & 120 LM |
73 |
2008 |
Construction of Slipway, Helipad and other Works At Armed Forces Observation Site @ Al Baraka (Contract # MW-LF-409-2006) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction of Slipway, Helipad and other Works At Armed Forces Observation Site |
74 |
2008 |
Construction Of Marine Works for Zayed Port Construction Department (Contract # MW-NF-394-2007) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction of Breakwaters, Sheet Pile Jetty |
75 |
2008 |
Construction Of Marine Fence for 314 meters @ Al Riyad Palace, Abu Dhabi, U.A.E. |
Sims Cont. & Transport L.L.C., Abu Dhabi, U.A.E. |
Construction Of Marine Fence for 314 meters |
76 |
2008 |
Bathymetric Survey At Al Hamra Area, Abu Dhabi, U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Bathymetric Survey |
77 |
2008 |
Bathymetric Survey At H.H. Sheikh Mohamad island, Abu Dhabi, U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Bathymetric Survey |
78 |
2008 |
Bathymetric Survey At Al Guzlan island, Abu Dhabi, U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Bathymetric Survey |
79 |
2008 |
Bathymetric Survey At Zayed port, Abu Dhabi, U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Bathymetric Survey |
80 |
2008 |
Bathymetric Survey At Ghagha Island, Abu Dhabi , U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Bathymetric Survey |
81 |
2008 |
Bathymetric Survey At Mirfa to Murawah, Abu Dhabi , U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Bathymetric Survey |
82 |
2008 |
Bathymetric Survey at Al riyad Palace, Abu Dhabi , U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Bathymetric Survey |
83 |
2008 |
Bathymetric survey for Ras Gumais Pipeline project, Abu Dhabi , U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Bathymetric Survey |
84 |
2008 |
Bathymetric Survey for Sila to Al Yasat Island, , Abu Dhabi , U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Bathymetric Survey |
85 |
2008 |
Construction Of Marine Works for Zayed Port Construction Department (Contract # MW-NF-394-2007) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction of Breakwaters, Sheet Pile Jetty |
86 |
2008 |
Beach Works @ H.H. Sheikh Haza'a island, Musafah Palace, Abu Dhabi, U.A.E. |
Capriole General Construction Company, Abu Dhabi, U.A.E. |
Beach Renovation Works |
87 |
2008 |
Construction Of Floating Marina for 129 Boats @ Fishing Port, Abu Dhabi, U.A.E. |
Fishery Co-Operative Of Abu Dhabi, Abu Dhabi, U.A.E. |
Construction Of Floating Marina for 129 Boats |
88 |
2008 |
Construction of Slipway, Helipad and other Works At Armed Forces Observation Site @ Al Baraka (Contract # MW-LF-409-2006) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction of Slipway, Helipad and other Works At Armed Forces Observation Site (Clients Temporary Stop the Construction Works due to their requirement) But Completed 25% of the Project |
89 |
2008 |
Install of 250mm Submarine pipeline from Ras ghumis to Ghagha Island, Abu Dhabi, U.A.E. |
General Construction Co., Abu Dhabi, U.A.E. |
Install of HDPE Pipeline 250mm dia from Ras Gumais to Ghagha island for length of 2,000 meter and Ghagha to kardal island size of 225mm dia for length of 1000 meter. Scope of work is included underwater trenching with trench depth of 1.5 mete and trench width 2.0 meter and install of pipeline in the same trench with backfill operation. |
90 |
2007 |
Construction Of Two (2) Breakwater & Beach Setting @ Al Ghuslan Island, Abu Dhabi, U.A.E. |
Capriole General Construction Company, Abu Dhabi, U.A.E. |
Breakwater Construction 75 LM |
91 |
2007 |
Construction of 20 LM Breakwater Extra @ Al Ghuslan Island, Abu Dhabi, U.A.E. |
Capriole General Construction Company, Abu Dhabi, U.A.E. |
Breakwater Construction 20 LM |
92 |
2007 |
Renovation Of Beach Sand @ H.H. Sheikh Hazza'a Bin Zaid Al Nahyan Private Island, Abu Dhabi, U.A.E. |
Capriole General Construction Company, Abu Dhabi, U.A.E. |
Beach Sand, Trenching And Dredging @ H.H. Sheikh Hazza’a (Musafah Palace) |
93 |
2007 |
Construction Of Sheet Pile Jetty and Mobile Traveling Lift For khaled Port At Sharjah, headquarter of Coast Guards Group (Contract # MW-OU-068-2007) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction Of Sheet Pile Jetty and Mobile Traveling Lift |
94 |
2007 |
Construction Of Rock protection and Marine Platform @ Ras Al Akhdar (Contract # MW-NF-188-2007) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction of Rock Protection , marina & landing Craft |
95 |
2007 |
Construction of Marina and Rock protection Works for Armed Forces @ Rumhan Island (Contract # MW-OU-478-2007) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction of Marina & landing Craft |
96 |
2007 |
Pipeline Installation @ Ajman U.A.E. |
Federal Electricity & Water Authority, Sharjah, U.A.E. |
Supply & Install of 1.2 meter dia. Pipeline for 360 Lm in 2 line |
97 |
2007 |
Construction of Pump House (8*6) meter @ Ras Gumais Naval Base, Abu Dhabi, U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction of Pump House (8*6) meter with 3 pump on work and 1 standby @ Ras Gumais Naval Base, Abu Dhabi, U.A.E. |
98 |
2007 |
Supply & install of 160 mm dia. HDPE pipeline 4.2 km at sea and 3.0 km at land @ al Abu Abyard Island, U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Supply & install of 160 mm dia. HDPE pipeline 4.2 km at sea and 3.0 km at land @ al Abu Abyard Island, U.A.E. |
99 |
2007 |
New HDPE 315 mm dia. Pipeline Installation From Ras Gumais to Al Qaffay Island 28 km |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Ghaffai Pipeline |
100 |
2007 |
Supply & install of 160 mm dia. Two seawater intake HDPE Pipeline @ Ajman, U.A.E. |
Federal Electricity & Water Authority, Sharjah, U.A.E. |
Supply & install of 160 mm dia. Two seawater intake HDPE Pipeline @ Ajman, U.A.E. |
101 |
2007 |
Supply & install of 160 mm dia. HDPE pipeline 4.2 km at sea and 3.0 km at land @ al Abu Abyard Island, U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Abu Abyaed Island |
102 |
2007 |
Cleaning of internal pipeline and repair works |
Federal Electricity & Water Authority, Sharjah, U.A.E. |
Cleaning of internal pipeline and repair works |
103 |
2007 |
Internal cleaning of pipeline and foundation (Ghalilah Power Station) |
Federal Electricity & Water Authority, Sharjah, U.A.E. |
Internal cleaning of pipeline and foundation (Ghalilah Power Station) |
104 |
2007 |
Supply & install of 160 mm dia. Two seawater intake HDPE Pipeline @ Ajman, U.A.E. |
Federal Electricity & Water Authority, Sharjah, U.A.E. |
Supply & install of 160 mm dia. Two seawater intake HDPE Pipeline |
105 |
2007 |
Diversion of Existing HDPE water Mains total length of 1.158 km @ coconut Island |
Capriole General Construction Company, Abu Dhabi, U.A.E. |
Diversion of Existing HDPE water Mains total length of 1.158 km @ coconut Island |
106 |
2007 |
Supply & install of 160 mm dia. HDPE pipeline 4.2 km at sea and 3.0 km at land @ al Abu Abyard Island, U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Supply & install of 160 mm dia. HDPE pipeline 4.2 km at sea and 3.0 km at land @ al Abu Abyard Island, U.A.E. |
107 |
2007 |
Construction of Pump House (8*6) meter @ Ras Gumais Naval Base, Abu Dhabi, U.A.E. |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction of Pump House (8*6) meter with 3 pump on work and 1 standby @ Ras Gumais Naval Base, Abu Dhabi, U.A.E. |
108 |
2007 |
Construction of Pump House @ Ajman, U.A.E. |
Federal Electricity & Water Authority, Sharjah, U.A.E. |
Construction of Pump HouseAjman, U.A.E. |
109 |
2007 |
Pipeline Installation @ Ajman U.A.E. |
Federal Electricity & Water Authority, Sharjah, U.A.E. |
Supply & Install of 1.2 meter dia. Pipeline for 360 Lm in 2 line |
110 |
2007 |
Supply & install of 160 mm dia. Two seawater intake HDPE Pipeline @ Ajman, U.A.E. |
Federal Electricity & Water Authority, Sharjah, U.A.E. |
Supply & install of 160 mm dia. Two seawater intake HDPE Pipeline @ Ajman, U.A.E. |
111 |
2007 |
Jetty Repairing |
RAK Ceramics, Ras Al Kaimah, U.A.E. |
Sheet Pile Jetty Repair |
112 |
2007 |
Construction Of Sheet Pile Jetty and Mobile Traveling Lift For khaled Port At Sharjah, headquarter of Coast Guards Group (Contract # MW-OU-068-2007) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Construction Of Sheet Pile Jetty and Mobile Traveling Lift |
113 |
2007 |
Rock Revetment for Zaid port, Head Quarter of Coast Guards (Contract # MW-OU-412-2006) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Rock Protection for 686 LM |
114 |
2007 |
Construction Of Rock Revetment for Armed Forces (Contract # MW-OU-059-2007) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Rock Protection for 220 LM |
115 |
2007 |
Construction of Breakwaters For Armed Forces |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Breakwater Construction for 200 & 140 LM |
116 |
2007 |
Construction Of Rock Protection for Erosion @ Delma Island Airport (Contract # MW-OU-163-2006) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Rock Protection For 1,250 meter |
117 |
2007 |
Construction Of Breakwater and Jetty at Coastal Guards Head Quarter (Contract # MW-OU-410R-2004) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Rock Protection , Breakwater Construction, Sheet Piling Works, Dredging |
118 |
2007 |
Construction Of Two (2) Breakwater & Beach Setting @ Al Ghuslan Island, Abu Dhabi, U.A.E. |
Capriole General Construction Company, Abu Dhabi, U.A.E. |
Breakwater Construction 75 LM |
119 |
2007 |
Construction of 20 LM Breakwater Extra @ Al Ghuslan Island, Abu Dhabi, U.A.E. |
Capriole General Construction Company, Abu Dhabi, U.A.E. |
Breakwater Construction 20 LM |
120 |
2006 |
Jetty Repairing |
RAK Ceramics, Ras Al Kaimah, U.A.E. |
Sheet Pile Jetty Repair |
121 |
2006 |
Delma Island / Abu Dhabi |
High Tech Steel Industries, Abu Dhabi, U.A.E. |
Butt Fusion Welding of 630mm HDPE Water Pipeline |
122 |
2006 |
Pipeline Installation at Jebel Ali |
Naboodha Bin Hafeez, Abu Dhabi, U.A.E. |
Pipeline Installation of backwash and chlorine |
123 |
2006 |
Construction Of Water Pipeline From Ras Gumais to Ghaffai Island |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
HDPE Pipe Line (315 mm Dia. ) Installation for 28,930 meter |
124 |
2006 |
Pipeline Installation @ Al Nakheel Area |
Federal Electricity & Water Authority, Sharjah, U.A.E. |
Supply & install of 1 meter dia. GRP pipeline for 80 LM with 2 line at Al Nakheeel Area, U.A.E. |
125 |
2006 |
Supply & Install of 13 Nos. Of Piles for Marina in Fujairah Naval base |
Riviera Boat Industrial Investment Co., Abu Dhabi, U.A.E. |
Sheet Pile Construction |
126 |
2006 |
Construction Of Naval Jetty 450meter At Al Sadar Port (Contract # MW-OU-413-2004) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Sheet Pile Construction |
127 |
2006 |
Construction of Boat Slipway @ Jebal Ali Naval Base (Contract # MW-NF-438R-2004) |
UAE Armed Forces, Directorate Of Military Works, Abu Dhabi, U.A.E. |
Boat Slipway Construction |